Floor Fixings Solutions

FLOORFIX HT, a part of the BEAMCLAMP clamping products range, was used on the new expansion of the Warburtons Super Bakery in Bristol. The existing Warburtons Bakery was extended with a 100 tonne portal frame. The new extension included a mezzanine floor to provide extra space for baking ovens and for other equipment.

The mezzanine has been erected using 8mm thick steel floor plate to span the steel frame and was secured into its final position using our M10 FLOORFIX HT. Once the floor plate was secured into position the whole floor was then covered in a waterproof screed.

The FLOORFIX HT provides a solution for securing down steel floor from the top side only without having to do any hot work on site or create any debris from drilling. This is especially important in the food industry. The product works on a cam system that once tightened provides a secure connection that will not work loose under vibration conditions created by walking/driving over the floor or for the vibrations created by machinery. Testing at TÜV has been carried out to confirm this.

More information on FLOORFIX HT.


Products Used in this Solution